Open Data Architecture & Impact Report
How Smart NSW turns NSW Open Data into everyday mobility decisions.
Smart NSW
An independent platform that unifies parking, roads and public transport across New South Wales into a single live view, using only official Transport for NSW Open Data.
Live coverage
Counted from the official feeds at the moment this page was opened. Numbers move because the data is live.
…
Live vehicles tracked now
…
Park & Ride car parks
…
Metro stations
…
Traffic cameras
…
Active road hazards
…
Active service alerts
199
Official taxi ranks
513
Audited station lifts (DSAPT)
869
Official NSW rest areas
Engineering architecture
Edge-rendered application
Server-side rendering and typed server functions run on an edge runtime. Heavy work — feed decoding, caching and joins — never reaches the browser, so first paint stays fast on mobile networks.
GTFS & GTFS-Realtime pipeline
Timetable bundles (GTFS) are downloaded, extracted and parsed server-side. Realtime vehicle positions, trip updates and service alerts arrive as Protocol Buffers and are decoded with the official GTFS-Realtime bindings, then normalised to a single internal model shared by every mode.
Per-feed isolation & caching
Each Transport for NSW feed is fetched independently with its own timeout, short-lived cache and last-good fallback. One failing feed degrades to an explicit “unavailable” state instead of breaking the map.
Credential safety
The Transport for NSW API key exists only on the server. No browser request ever carries it, and no upstream endpoint is called directly from the client.
Data pipeline
Transport for NSW Open Data
├─ Car Park API (JSON)
├─ GTFS Schedule bundles (ZIP)
├─ GTFS-Realtime (Protocol Buffers)
├─ Trip Planning API (JSON)
└─ Live Traffic cameras & hazards (GeoJSON)
│ API key server-side only
▼
Edge server functions
├─ per-feed timeout + isolation
├─ protobuf decode & GTFS parse
├─ normalise to one internal model
└─ short-lived cache + last-good fallback
│ clean JSON only
▼
Browser: map, journey planner, alertsAlignment with NSW policy
NSW Open Data Policy
Built entirely on published Transport for NSW Open Data, demonstrating public value created from open government datasets without privileged access.
Future Transport Strategy
Supports customer-focused, multimodal decision making by putting parking, roads and public transport in one view, and by making Park & Ride transfers practical.
Disability Standards for Accessible Public Transport 2002
Accessible-only journey planning through the official wheelchair parameter, plus a dedicated view of lift, escalator and step-free access disruptions.
NSW Smart Places Strategy
Realtime feeds are decoded and normalised into a single reusable mobility model that can extend to further modes and datasets.
These are the published strategies this platform was designed to support. Smart NSW is independent and is not endorsed by or affiliated with any of these programs.
Integrated official sources
| Dataset / API | Use in Smart NSW |
|---|---|
| Car Park API (Park & Ride) | Live space availability, occupancy and history. |
| GTFS Schedule — Sydney Metro | Stations, routes, shapes and scheduled departures. |
| Timetables — For Realtime | Route, headsign and stop names joined to live vehicles. |
| GTFS-Realtime Vehicle Positions | Live buses, trains, ferries and light rail on the map. |
| GTFS-Realtime Trip Updates | Remaining stops and path for a selected vehicle. |
| Public Transport Realtime Alerts v2 | Service disruptions by mode, route and stop. |
| Trip Planning API | Journey planning, departure boards and nearby stops. |
| Live Traffic Cameras | Current still images from the road network. |
| Live Traffic Hazards | Incidents, roadworks, floods, fires and major events. |
| Taxi Rank Locations | Official rank locations across NSW. |
| Interchange Facilities Data (DSAPT) | Audited lift inventory at NSW stations and wharves. |
| NSW Rest Areas | Driver fatigue stops with published facilities, mapped and matched to road corridors. |
Accessibility & compliance
Accessible journeys
Wheelchair and low-floor flags are shown only where Transport for NSW publishes them, and accessible-only journey planning uses the official wheelchair parameter rather than a local guess.
Interface standards
Semantic landmarks, keyboard-operable controls, visible focus, live status announcements and mobile-first layouts are used throughout, targeting WCAG 2.1 AA.
DSAPT station infrastructure
The official interchange facilities audit (May 2025) is integrated in full: 513 lift assets across 186 NSW stations and wharves, each with its Transport for NSW asset code, coordinates and platform-to-concourse description.
Static audit joined to live alerts
Audited lift inventory is cross-checked against the official Realtime Alerts feed, so a station shows how many lifts exist and whether any is named in a current disruption. Absence of an alert is never presented as a guarantee of service.
Civic impact methodology
Modal shift estimates
- Car: 0.165 kg CO₂e per kilometre (single occupant, petrol).
- Electrified urban rail: 0.035 kg CO₂e per passenger kilometre.
Estimates only. Distances are straight-line between the selected car park and destination. Emissions use the Australian National Greenhouse Accounts factors (0.165 kg CO₂e per km for a single-occupant petrol light vehicle and 0.035 kg CO₂e per passenger-km for electrified urban rail). Transport for NSW does not publish these figures.
Data integrity rules
- • No value is invented. Missing data is shown as “unavailable”.
- • Timetable data is labelled “Scheduled”; only realtime feeds are “Live”.
- • Metro is schedule-only because no official metro vehicle-position feed exists.
- • Taxi ranks show locations only — availability is not published.
- • Fares appear only when Transport for NSW returns them.
- • Freshness timestamps come from the feed, not from the render time.
Smart NSW is an independent mobility platform and is not affiliated with or endorsed by the NSW Government. Transport information is sourced from Transport for NSW Open Data.